Educational Institutions

Company Scope:

  • Nursing College setting up a new location

TruEnergy’s Analysis:

  • Customer was building a new location which would need power to three new meters at specific times

Custom Action Plan:

  • Used a proxy in order to figure out estimated usage since these were new locations without usage history
  • Arranged to have existing meter shut off so the customer would no continue to be charged for it
  • Made sure power was on by the time the customer needed it

Follow Up:

  • Repeated the same process for a location that later opened in Dallas

Overview

Business Type:
Educational Institution

Location:
Pearland, TX

Annual Energy Consumption:
995.451 MWh

image-downloadpdf
wpd58fa856_06